Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
|
|
|
|
|
نویسنده
|
Aryanezhad Mir Bahadorgholi ,Karimi-Nasab Mehdi ,Fatemi Ghomi Mohammad Taghi
|
منبع
|
journal of optimization in industrial engineering - 2009 - دوره : 2 - شماره : 4 - صفحه:1 -11
|
چکیده
|
Model building is a fragile and complex process especially in the context of real cases. each real case problem has its own characteristics with new concepts and conditions. a correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. this paper discusses how to build an efficient model for a real case production planning problem. this process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its np-completeness. also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. finally, the case study and its solution methods are discussed briefly.
|
کلیدواژه
|
Multi-objective; Single machine; Production planning; Multi-Product; Multi-Period; Controllable processing time; Pareto-optimal solutions
|
آدرس
|
iran university of science and technology, Department of Industrial Engineering, ایران, iran university of science and technology, Department of Industrial Engineering, ایران, amirkabir university of technology, Department of Industrial Engineering, ایران
|
پست الکترونیکی
|
mehdikariminasab@yahoo.com
|
|
|
|
|