   A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management  
   
نویسنده Peyghami Peyghami ,Mokhtari Hadi ,Aghaie Abdollah
منبع international journal of industrial engineering and production research - 2013 - دوره : 24 - شماره : 3 - صفحه:177 -187
چکیده    Tradeoff between time and cost is an important issue in planning a project. this paper deals with a stochastic time-cost tradeoff problem (tctp) in pert network of project management. all activities are subject to linear cost function and assumed to be exponentially distributed. the aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is minimized. a single path tctp is constructed as an optimization problem with decision variables of activity mean durations. we then reformulate the single path tctp as a cone quadratic program in order to apply polynomial time interior point methods to solve the reformulation. finally, we develop an iterative algorithm based on monte carlo simulation technique and conic optimization to solve general tctp. the proposed approach has been tested on some randomly generated test problems. the results illustrate the appropriate performance of our new approach.
کلیدواژه Project Management; ,Conic Optimization; ,Time-Cost Tradeoff Problem; ,Interior Point Methods; ,Monte Carlo Simulation
آدرس Department of Applied Mathematics, Tehran, Iran, ایران, Department of Industrial Engineering, Tehran, Iran, ایران, Department of Industrial Engineering, Tehran, Iran, ایران