|
|
Bi-Criteria Robotic Cell Scheduling and Operation Allocation in the Presence of Break-downs
|
|
|
|
|
نویسنده
|
vaisi bahareh ,farughi hiwa ,raissi sadigh
|
منبع
|
international journal of industrial engineering and production research - 2018 - دوره : 29 - شماره : 3 - صفحه:343 -357
|
چکیده
|
This paper focused on scheduling problems arising in a two-machine, identical parts robotic cell, which was configured in a flow shop. through the current research, a mathematical programming model on minimizing cycle time as well as operational cost, considering the availability of a robotic cell as a constraint, was proposed to search for the optimum allocation and schedule of operations for both two machines. two solution procedures, including weighted sum method and ε-constraint method, were provided. based on the weighted sum method, like some previous studies, sensitivity analysis on model parameters was done, and the optimum solutions were compared with previous results, while ε-constraint method could find the pareto optimal solutions to problems with up to 18 operations in a reasonable time.
|
کلیدواژه
|
Robotic manufacturing cell; Scheduling; Breakdowns; Weighted sum method; ε-constraint method.
|
آدرس
|
islamic azad university, south tehran branch, school of industrial engineering, iran, university of kurdistan, department of engineering, iran, islamic azad university, south tehran branch, department of industrial engineering, iran
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|