|
|
A Multi-Objective Programming to Increase Labor Efficiency of a Truck Hub: A Case Study
|
|
|
|
|
نویسنده
|
Sadjadi S.J. ,Alinezhad Esboei A.
|
منبع
|
international journal of industrial engineering and production research - 2012 - دوره : 23 - شماره : 2 - صفحه:155 -162
|
چکیده
|
The problem of staff scheduling at a truck hub for loading and stripping of the trucks is an important and difficult problem to optimize the labor efficiency and cost. the trucks enter the hub at different hours a day, in different known time schedules and operating hours. in this paper, we propose a goal programming to maximize the labor efficiency via minimizing the allocation cost. the proposed model of this paper is implemented for a real-world of a case study and the results are analyzed.
|
کلیدواژه
|
Staff Scheduling ,Multi-Objective Programming ,Labor Efficiency ,Goal Programming
|
آدرس
|
iran university of science and technology, Dept Industrial Engineering, ایران, iran university of science and technology, Dept Industrial Engineering, ایران
|
پست الکترونیکی
|
sjsadjadi@iust.ac.ir
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|