Fuzzy Network Analysis for Projects willa high Level of Risks - Uncertainty in Time and Structure
|
|
|
|
|
نویسنده
|
Morovatdar R. ,Aghaie A. ,Haji Yakhchali S.
|
منبع
|
international journal of industrial engineering and production research - 2011 - دوره : 22 - شماره : 1 - صفحه:73 -82
|
چکیده
|
In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness but as it is usually experienced in real projects, the structure of the network is also subject to changes. in this paper we consider three types of imprecision namely activity duration, activity existence and precedence relation existence which make our general fuzzy project network. subsequently, a corrected forward recursion is proposed for analysis of this network. since the convexity and normalization of traditional fuzzy numbers are not satisfied, some corrected algebraic operations are also presented. employing the proposed method for a real project reveals that our method results in more applicable and realistic times for activities and project makespan in comparison to classic fuzzy pert
|
کلیدواژه
|
Project network Fuzzy PERT Fuzzy structure Non-convex fuzzy numbers High-risk projects
|
آدرس
|
k.n.toosi university of technology, Department of Industrial Engineering, ایران, k.n.toosi university of technology, Department of Industrial Engineering, ایران, university of tehran, College of Engineering, Department of Industrial Engineering, ایران
|
پست الکترونیکی
|
aaghaie@kntu.ac.ir
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|