   How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot  
   
نویسنده Sadeghian Ramin
منبع international journal of industrial engineering and production research - 2010 - دوره : 21 - شماره : 1 - صفحه:17 -22
چکیده    He materials requirements planning (mrp) method that is applied in production planning and management has some weaknesses. one of its weaknesses is that the time in mrp method is discrete, and is considered as time period. hence we are not able to order our requirements at irregular time moments or periods. in this paper, a new form of mrp is introduced that is named continuous materials requirements planning (cmrp) approach. we discuss the disadvantages of discrete mrp (dmrp) approach and analyze the conditions, applications and the manner of applying cmrp approach in our problems.
کلیدواژه Discrete Materials Requirements Planning (DMRP) ,Continuous Materials Requirements Planning (CMRP) ,Order Type (OT) ,Lot for Lot (L4L)
آدرس bu ali sina university of hamadan, Engineering Department, ایران
پست الکترونیکی rsadeghian@basu.ac. ir
 
     
   