   Risk factors for design and build projects in Malaysia – Project manager’s perception  
   
نویسنده saaidin s. ,endut i.r. ,samah s.a.a. ,ridzuan a.r.m.
منبع pertanika journal of science and technology - 2017 - دوره : 25 - شماره : S.May - صفحه:185 -190
چکیده    The design and build concept has become a popular contract system. it requires the owner and contractor to identify,analyse and manage risks and search for the best solutions to improve performance. the objective of this paper is to identify the project manager’s perception of risk factors associated with the design and build project in malaysia. a total of 100 usable questionnaires were received and analysed using mean ranking and factor analysis. the results show that three most risky factors are: “client financial capability”,“inadequate cash flow by contractor”,and “lack of payment (delayed progress payment by owner to the contractor)”. risk can be grouped into 12 categories,namely: (1) lack of management competency; (2) lack of contractor experience; (3) political issues; (4) lack of standardized system; (5) unpredictable issues; (6) lack of client experience; (7) safety issues; (8) lack of teamwork; (9) poor supervision by client; (10) lack of client information; (11) material availability; and (12) design error. © 2017 universiti putra malaysia press.
کلیدواژه Design and build; Project manager; Risk factor
آدرس faculty of civil engineering,universiti teknologi mara,shah alam,selangor, Malaysia, faculty of civil engineering,universiti teknologi mara,shah alam,selangor, Malaysia, academy of language studies,universiti teknologi mara,shah alam,selangor, Malaysia, faculty of civil engineering,universiti teknologi mara,shah alam,selangor,malaysia,institute for infrastructure engineering and sustainable management,universiti teknologi mara,shah alam,selangor, Malaysia
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved