   evaluation of operational performance factors and improvement strategies for a typical power generation system in nigeria  
   
نویسنده nkuku i. p. ,nwaji n. g. ,ekpechi d. a. ,anyanwu e. e.
منبع iranica journal of energy and environment - 2025 - دوره : 16 - شماره : 4 - صفحه:607 -615
چکیده    This paper presents the analysis of key operational performance indicators and some effective improvement strategies, carried out on four gas turbine generators of a power plant company, in nigeria for a period of four years (2019-2022). the investigation used the nerc/ieee standard 762 generator performance indices amongst other calculated key performance indices in the evaluation of the collected data. the research methodology was done through collection of data using questionnaires, operational records and plant data sheets recorded by operators in the power station and data analysis using excel and python software, afterward, constructive optimization techniques were recommended for each operational factor. from the result obtained, the operational performance shows an average energy generation of approximately 389.71 gwh. the equipment availability factor averaged 54.08%, indicating moderate reliability. the energy availability factor was notably lower, averaging 11.99%, suggesting significant room for improvement. the capacity factor averaged 9.39%, while the plant use factor was relatively high at 80.59%, demonstrating efficient usage when operational. the load factor was low, with an average of 0.10, pointing to potential underutilization of capacity. the shortfall in performance levels of the plant is attributed to less plant availability due to overdue overhauling of some units resulting in frequent breakdowns/failures, obsolete technology, ageing plant equipment, instability of the national grid system, among others. the recommended strategic techniques are designed to address the specific challenges associated with each factor, thereby enhancing the overall operational performance of the power plant and other power generation companies for maximum productivity.
کلیدواژه energy availability ,gas turbine performance ,operational indicators ,optimization techniques ,power plant reliability
آدرس federal university of technology, department of mechanical engineering, nigeria, federal university of technology, department of mechanical engineering, nigeria, federal university of technology, department of mechanical engineering, nigeria, federal university of technology, department of mechanical engineering, nigeria
پست الکترونیکی emmanuel.e.anyanwu@futo.edu.ng
 
     
   