|
|
due date assignment and jit scheduling problem in blocking hybrid flow shop robotic cells with multiple robots and batch delivery cost
|
|
|
|
|
نویسنده
|
rezaeian j. ,derakhshan n. ,mahdavi i. ,alizadeh foroutan r.
|
منبع
|
international journal of industrial mathematics - 2021 - دوره : 13 - شماره : 2 - صفحه:145 -162
|
چکیده
|
In this paper, just-in-time scheduling problem with batch delivery and due date assignment for hybridow shop robotic cells is considered. a mixed integer linear programming (milp) model is presentedto determine the sequence of jobs and robot moves. two meta-heuristic algorithms including articialimmune system (ais) and tabu search (ts) are proposed. the results show that ais performs wellfor this problem.
|
کلیدواژه
|
jit scheduling ,robotic cells ,multiple robots ,batch delivery ,due date assignment
|
آدرس
|
mazandaran university of science and technology, department of industrial engineering, iran, mazandaran university of science and technology, department of industrial engineering, iran, mazandaran university of science and technology, department of industrial engineering, iran, mazandaran university of science and technology, department of industrial engineering, iran
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|