>
Fa   |   Ar   |   En
   constrained non-renewable resource allocation in metagraphs with discrete random ‎times  
   
نویسنده akhoundi shiviyari n. ,hashemin s. s.
منبع international journal of industrial mathematics - 2019 - دوره : 11 - شماره : 4 - صفحه:293 -305
چکیده    In this paper, it is supposed that a project can be shown as a metagraph. the duration of activities are discrete random variables with known probability function, also one kind of consumable and constrained resource is required to execute each activity of the project. besides, the probability functions of activity durations depend on the amount of the resource allocated to it. clearly, the amount of resource which can be allocated to each activity is limited to specic values. in this paper, it is assumed that the due date of project is known and denite. the objective of this paper is to maximize the probability of completion of stochastic metagraph before the due date of the project. as respects, solving the problem by using the analytical method is very challenging; therefore, we developed a new heuristic method including two sub-algorithms for solving the problem. twenty examples were designed for examining the proposed algorithm.
کلیدواژه constrained resource allocation ,stochastic metagraph ,project completion time
آدرس islamic azad university, ardabil branch, department of industrial engineering, iran, islamic azad university, ardabil branch, department of industrial engineering, iran
پست الکترونیکی s.s.hashemin@gmail.com
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved